After the rail was hauled out of the abandonded siding it was loaded trailers or set aside for later use. Some was taken to High School Crossing. |
Date:
7/25/2009 |
Location:
Ellsworth, ME Map |
Views:
150 |
Collection Of:
David Larrabee |
|
Author: David Larrabee
|
|
Picture Categories: RollingStock,Yard,Track,Action |
This picture is part of album: Working on the Downeast Scenic RR |