From left to right: DB 185 107 with a BLS 185 behind, BLS Re 4/4 181 with a second unit, DB 185 123 with another behind and MRCE ES64F4 hired to Captrain Italia S.r.l. Those units are usually used as second or third unit for freight trains over the Gotthard ramp. |